THE CONTROL AND MANAGEMENT OF THE DRILLING PROCESS

Rational, in particular optimal control of the drilling process is a solution to any drilling problem, which is impossible without the relevant controls for information collection and technical devices for its processing and management.

Complex controls should include devices to measure power load on the drill bit, the frequency of its rotation, the torque on the drill bit, flow of flushing fluid drilling, mechanical drilling speed and pressure and mud properties.

Our modern drilling rigs for exploration and production drilling are equipped with a complex system of ground control of the drilling process, which allow to control all these processes.

One thought on “THE CONTROL AND MANAGEMENT OF THE DRILLING PROCESS

  1. Pingback: Бурение | PiterGeo